Kerri Snoddy briefly read through the highlights of the Ministry of Environment inspection of the site from November of 2020.
Lloyd Robertson inquired about the PFAS sampling mentioned in the inspection report. Kerri confirmed that all of this sampling was completed in 2019. Staff are waiting for MECP review of these results.
David Webb suggested that staff look into options for having a smaller camera used in the next CCTV inspection to resolve areas where the camera cannot pass through the leachate collection pipes.
The PRC commended staff for not having any issues or action items of non compliance noted as a result of the inspection.