The MECP approved an amendment to the ECA and design for the new section of Cells 4 and 5 (North Half).During construction is was found that waste and cover soil placement in an adjacent cell was covering a temporary berm which was to be removed. In order to maintain proper drainage WSP proposed to excavate holes and cut portions of the geomembrane within the berm rather than removing the entire berm and soil placed on top.